top of page

Gems Commercial

Location

Yangon, Myanmar

Year

2013

Scope

Conceptual Design

Site Area

8.500sqm

Client

Capital Diamond Star Group

Details

The building is divided into three blocks. The 5-story podium on a 1 level basement parking contains a shopping mall, a hypermarket and facilities for the hotel. The 27-storey hotel tower is located in the north part of the site and the 23-storey office block is in the south.

Participated role:

In charge of modeling for conceptual design, 3D Visualization, 2D CAD drawings, prepare the presentstion with clients.

Source

RSP Vietnam

http://www.rsp.vn/en/

by HUYNH DUC THUA architect +

bottom of page